Hangzhou Chunjiang Power Equipment Co., Ltd.
AI Review Writer
The AI will rewrite your review points into a professional review.
Company Profile
Products
Seller Review
Contact Us
No Ads Found
This company hasn't posted any ads yet.
No Reviews Found
This company hasn't received any reviews yet.
Contact Us
Provide details about your needs, such as the specific products and services you require, and any questions you have for suppliers. We'll forward this information, along with your contact details, to your selected suppliers. For urgent requests, contact them directly using the information on their profiles.
About Us
Hangzhou Chunjiang Power Equipment Co., Ltd. which was established in 1989, is located in Xiaoshan District of Hangzhou and opposite to the beautiful West Lake. Our company specializes in manufacturing hydro turbine-generator units and providing hydro station renovation and consultation services. We employ over 70 professionals, including 3 professor-level senior engineers, 5 senior engineers, 3 advanced technicians and 12 engineers. With leading runner blade manufacturing technology, consummate techniques and rich technical know-how in the industry, our company has been supplying state-of-the-art hydro equipment, matched with considerate and responsive after-sales services. Our company manufactures hydro units with up to 4.0m rotors and 6,250mm stator frames. The manufacturing capability is represented by operational hydro units with 2.5m Francis rotors, 3.0m propeller rotors, 2.75m Kaplan rotors, 3.3m tubular fixed rotors, 4.35m generator stator frames and 10MW installed capacity. Our units suit the water head of 4m (minimum) and 248m (maximum). Our company has supplied products all over China, mainly in Central and Southern China, while certain units are installed in Tibet and Xinjiang in the west, Heilongjiang and Liaoning in the north and Hainan in the south. Our company has provided capacity expansion services for a number of hydro stations in China, achieving capacity enhancement of over 30% in all cases. A successful case is at Luositang Hydro Station, where each of the two units of 1.6MW was expanded to 3.5~3.6MW (increased by 119%~125%) without changing the existing civil structure (including draft tube and runner chamber). Our company attained ISO9001 certification in 2003. Please feel free to contact us for further information.